Complete rail welding plant in a 9.2 m container
1200 kN upsetting and 3000 kN clamping force
50-75 kg/m rails across Chinese, European, Russian and American profiles
Continuous and pulsating flashing welding
Integrated YHR-120 induction normalising head
13-14 joints/hour welding and heat-treatment rate
100000+ joint records with uneditable data
-20 C to 50 C and up to 4000 m altitude
Emergency reset to travelling state within 15 minutes
Configured to the ordered rail and project
A long-string renewal possession rarely leaves room for a second attempt. The rail ends have to be aligned, flashed, upset and dressed inside the window the infrastructure owner has granted, and the joint has to be documented well enough to be signed off months later. A mobile flash butt welder earns its place on that job by carrying everything the cycle needs - power, hydraulics, cooling, lifting and post-weld heat treatment - to the work site rather than asking the site to provide them.
The YHG-1200TH is built around that idea. It is a complete rail welding plant integrated into a 9.2 m container, with a diesel generator set, welding head, hydraulic power unit, chiller unit, double-arm crane assembly, electrical control cabinet and normalising power supply inside the same enclosure. The welding control adjusts flashing feed speed, welding voltage and current to the process in use, and the head supports both continuous flashing and pulsating flashing welding of rails.
Containerised construction changes what a welding crew has to organise. The enclosure carries sound and thermal insulation to reduce noise and heat radiation, a heating and cooling air conditioner to keep the electronics within their working range, four-point load-bearing lifting lugs for handling, and fire extinguishers at several positions. The power supply needs no external cooling water from the user; circuit, heat dissipation and temperature protection are built in.
A double-arm crane carries the welding head out to the joint and provides extension, retraction and 180° slewing, with a maximum lifting capacity of 10 t. The chiller cools the welding head and auxiliary devices, including the normalising coil and transformer, and its refrigeration temperature can be set. Two separate hydraulic subsystems serve the welding head and the crane, so a lift can be positioned without disturbing the clamping circuit.
What arrives on site, in other words, is not a welding head with a list of site services to be arranged. It is the head plus its power, cooling, handling, control and heat-treatment equipment in one transportable unit - the reason mobile flash butt welding is practical on long rail strings and in remote possessions.

The head is the part that does the work. It clamps the two rail ends, then completes flashing, upsetting and burr pushing under hydraulic drive. Maximum upsetting force is 1200 kN and maximum clamping force is 3000 kN; the head itself weighs 4500 kg. Its movable and fixed frames are compact enough to provide the upsetting stroke and the space needed for pressure-held burr pushing in a confined work area.
Pressure is held on the rail throughout the welding process. That detail matters on continuously welded rail: the head is designed for tensile-stress welding of long rail strips in the 1500-2000 m range, where the joint has to be made without releasing the string. Clamping, pressure holding, upsetting and hot-state pressure-held burr pushing are therefore one continuous sequence, not four separate set-ups.
Welding process parameters can be modified and stored. The head acquires welding data, stores it, analyses it, judges the result, generates reports and exports the data - the machine-side input to the traceability system described in Section 6. Two welding processes are available, continuous flashing and pulsating flashing; which one is used depends on the approved procedure for the rail grade and section being joined, and the project's welding procedure specification governs.
For the rail sections and grades that this head can join, see Section 4. Where a welded string meets a bolted or insulated boundary, the joint is usually a insulated fishplates assembly or a glued insulated rail joints rather than another weld; the signalling design decides where that boundary sits.

The figures below are the machine's rated values from the technical specification. They describe the plant as delivered; acceptance limits for a particular project belong in the approved welding procedure and the order's technical agreement.
Parameter | Value |
Rated voltage of main power supply (generator set) | 400 V |
Rated power frequency | 50 Hz |
Phases, main welding circuit | 2 |
Phases, main heat-treatment circuit | 3 |
Phases, control system supply | 3 |
Rated primary circuit current (50% duty cycle) | 600 A |
Rated power, main welding circuit | 240 kVA |
Maximum power, control and hoisting system | 50 kVA |
Maximum working pressure, hydraulic system | 20 MPa |
Maximum upsetting force | 1200 kN |
Maximum clamping force | 3000 kN |
Medium-frequency normalising frequency | 1.0-2.5 kHz |
Maximum air-blast pressure | 0.6 MPa |
Heating time | <= 240 s |
Air-blast cooling time | >= 300 s |
Welding head weight | 4500 kg |
Maximum welding and heat-treatment rate | 13-14 joints/hour |
Maximum treatable rail cross-section | 12000 mm2 |
Welding data storage capacity | >= 100000 records |
The 13-14 joints/hour figure covers the welding and heat-treatment cycle together, not flashing alone. On a real possession the number of joints completed also depends on rail handling, alignment and the time allowed for inspection, so treat it as plant capacity rather than a site output guarantee.
Two pressure figures need to be kept apart. The hydraulic system is rated at 20 MPa and its proportional relief valve is set by the control system to suit the welding process; the hydraulic pump unit itself is rated for a maximum continuous working pressure of 28 MPa. One is the system setting, the other the pump's capability. Section 10 lists the pump unit separately.

The head is specified for rails from 50 kg/m to 75 kg/m, with a maximum treatable cross-section of 12000 mm2, and is compatible with Chinese, European, Russian and American standard rail profiles. Pearlitic and bainitic high-strength rail steels are within the stated material range. That breadth is useful on networks where a single welding fleet covers several rail generations, and on cross-border projects where the rail profile changes at a handover point.
Breadth does not mean one set of tooling for everything. Welding a different rail section or grade requires the matched electrodes and burr-pushing cutter to be changed, and the normalising coil can be changed to suit the profile. One set is supplied as standard at factory delivery; additional sets, the rail sections to be covered and the approved welding procedure are confirmed against the order. Tell us the rail profile, grade and the standards the joints will be judged against in the first enquiry, and we will confirm the tooling and configuration before quoting.
Turnout and crossing work is where this flexibility is tested most often. Rail ends at a switch or crossing sit inside a tighter geometry than plain line, and the welding sequence has to be planned around the railway turnout assembly already installed. Where the design keeps a bolted or insulated boundary near the turnout, the choice between a welded joint and an insulated joint belongs to the signalling and track layout, not to the welder alone.
The specification states that welded joints are made to the relevant standards of the network in question. It does not name a test standard or issue a certificate with the machine. Inspection records, non-destructive testing and third-party witness testing are agreed as optional items with the order, and the acceptance criteria come from the infrastructure owner's procedure.

A flash butt joint is not finished when the burr is pushed off. The heat-affected zone has to be normalised before the rail goes into service, and on this plant that step is built in rather than brought in as a separate machine. The YHR-120 is the designation of that normalising head within the YHG-1200TH plant. The head uses an open-close, profile-following induction heating coil and a load-adaptive power supply. The supply adjusts output power and frequency as the joint temperature changes, with stepless regulation against preset parameters, so the temperature distribution across the joint cross-section stays even.
The coil position can be adjusted in all directions, which makes alignment with the rail profile straightforward; coils are changed when the rail section changes. A chiller cools the coil and the transformer, and the refrigeration temperature can be set. The medium-frequency supply provides over-current and over-voltage protection, and air-blast cooling follows normalising.
Process figures from the specification: medium-frequency normalising at 1.0-2.5 kHz, heating temperature 850-950 C, rail-top to rail-foot temperature difference below 70 C, heating time up to 240 s and an air-blast cooling period of at least 300 s. The heat-treatment unit's own sub-specification quotes a generator set of at least 120 kW and a medium-frequency supply of at least 80 kW for the normalising circuit; these are component ratings, distinct from the whole-plant figures in Section 3. When specifying the machine, use the voltage and heating-time figures in the plant's main parameter table; the heat-treatment unit's own figures describe that subsystem only.
The practical consequence for a crew is that welding, normalising and controlled cooling are one supervised sequence, with the process values captured in the same record. There is no separate heat-treatment mobilisation to schedule inside the possession.

Every joint needs a file that survives the job. The welding management system communicates with the electrical control system over a network port, collects and displays welding data, judges each result automatically against preset criteria, and archives the record for that joint. It monitors the full welding process, records process parameters over time for both welding and heat treatment, and plots them as curves. Data once generated cannot be edited - the point of the system is that the record is the record.
Auxiliary data is entered by the operator: line, up or down track, station section, mileage, left or right rail, rail maker and model, rail length, welding operator and date. Those fields can be changed only with authorisation. Storage covers at least 100000 welding and heat-treatment joint records and at least 10 sets of welding and heat-treatment process parameters. Records can be dumped or printed through a USB interface, and a laser printer with USB connection produces daily reports and welding curve diagrams.
The phased welding report carries the rail model, steel grade, welding date and time, joint identification code, upsetting amount, rail consumption, clamping condition, joint qualification judgment, plus line, track direction, mileage mark, mileage, left/right rail and station section. That is the set of fields a site engineer normally needs when a joint is queried months later.
The machine supports automatic and manual modes. In manual mode the pre-weld preparation steps are completed item by item from the panel, which is how a crew sets up and checks the head before committing to an automatic cycle. Automatic judgment does not replace the infrastructure owner's inspection: acceptance still follows the approved procedure and the tests agreed with the order.
Where a boundary must remain electrically separate, the record for that location belongs to the insulated joint assembly instead; a welded joint cannot serve that function. The distinction is worth making at the planning stage, because it changes both the layout and the documentation package.

The diesel generator set feeds the welding head, electrical control cabinet, hydraulic power unit, cooling system, head suspension, air conditioning and lighting. It uses electronic fuel injection and control, a high-inertia flywheel, and windings designed for the impact load that a welding cycle puts on a generator. A noise-reducing canopy, anti-shock mountings, exhaust silencer and corrugated pipes are fitted. The 1000 L fuel tank has a level gauge and a manual filling pump - a detail that matters on a possession where refuelling is not available.
The electrical control cabinet is the control core of the plant. It supplies all components, keeps the hydraulic and cooling systems synchronised with the welding sequence, collects welding and heat-treatment data from sensors and passes it to the welding management system. Key electrical components such as sensors are specified as high-reliability products; the control system issues the instructions for the whole welding sequence.
Two smaller subsystems are easy to overlook until they fail. A UPS accepts 115-300 V input and delivers 220 V at 3 kVA to keep the control electronics alive through generator transients. The chiller is rated at 3.2 kW with 7500 kcal/h of cooling capacity in a 1000 x 600 x 1100 mm package, and serves the normalising coil and transformer as well as the welding head. The enclosure's heating and cooling air conditioner keeps the electronics within their working environment, while the sound and thermal insulation layers reduce what escapes to the crew outside.
The double-arm crane has a 180° slewing range and a maximum lifting capacity of 10 t. Its hydraulic circuit is separate from the welding head circuit, so positioning the head does not disturb the clamping pressure. Four-point lifting lugs on the container handle the plant itself when it has to be moved between sites.

Site conditions decide whether a containerised plant is the right choice, so the specification sets the boundaries explicitly:
Condition | Limit |
Ambient temperature | -20 C to 50 C |
Altitude | <= 4000 m |
Relative humidity | <= 90% |
Minimum curve radius | 180 m |
Maximum gradient | 30 per mille |
Applicable curve superelevation | 180 mm |
The altitude figure is the one most often queried on mountain routes, because generator output and cooling both derate with height; the temperature and humidity limits matter just as much for the control electronics. The curve radius, gradient and superelevation values describe where the plant can be positioned and worked, not the geometry of the weld itself. If a project sits outside any of these limits, say so in the enquiry - the configuration, cooling package and generator sizing are confirmed against the actual site conditions rather than assumed.Where that choice is between a mobile flash butt plant and field thermite welding, the comparison in flash butt welding vs thermite welding sets out the constraints before the cost.Where welding sits against the other two maintenance jobs on a network, the division of work is set out in track maintenance equipment.

A plant that cannot be cleared from the track is a liability. The hydraulic system has a safety emergency arrangement: if the power system or the main hydraulic system fails, the emergency system resets all working devices to the travelling state within 15 minutes, and a mechanical retraction function is available as a further fallback. On a possession with a fixed hand-back time, that recovery path is as important as the welding cycle.
The hydraulic oil tank is fitted with heating and heat dissipation to hold a stable operating temperature, plus filtration, circuit protection and fault alarms. A return-oil filter keeps system oil cleanliness at or better than the 18/15 grade specified in GB/T 14039. The system is rated at 20 MPa and the control system regulates pressure through a proportional relief valve, whose setting can be changed to suit the welding process. Hydraulic lines near the engine and the welding position are protected with fire-resistant, high-temperature-resistant materials.
The generator set alarms on overload, low fuel, insufficient or abnormal engine oil, abnormal phase, voltage and current, and emergency shutdown. Two emergency stop buttons are mounted at the front of the enclosure with clear nameplates, one on the welding head operating panel and one on the control cabinet door; pressing any of them stops the machine. A smoke alarm and fire extinguishers at several positions complete the enclosure's protection.
After a weld is dressed, the rail head still needs finishing to the profile the line requires. That finishing work is normally done with rail grinding and milling machines ; planning the two operations together avoids a second possession for the same stretch of track.

The table below collects the component-level figures from the specification. Values are component ratings, not whole-plant ratings; the hydraulic pump unit's 28 MPa, for example, is a pump capability while the system is set to 20 MPa.
Component | Rated figures |
Diesel generator set | 400 V, 50 Hz, 3 phases, power factor 0.8; 1500 r/min rated speed, 800 r/min idle; 18.9 L displacement; 1000 L fuel tank; 3800 x 1300 x 2100 mm; 4500 kg; insulation class H |
Double-arm crane | Working radius 1 m; maximum lifting capacity 10 t; 180 deg slewing |
Hydraulic pump unit | Max continuous working pressure 28 MPa; max speed 2200 r/min; displacement 71 cm3; max flow 107 L/min at 1500 r/min; max torque 50 N m; drive motor 22 kW; weight 33 kg |
UPS | Input 115-300 V; output 220 V; rated 3 kVA |
Chiller | 3.2 kW; cooling capacity 7500 kcal/h; 1000 x 600 x 1100 mm |
Welding management system | Laser printer with USB interface; daily reports and welding curve printout |
The generator set's own component table lists output power and rated power as separate line items with different values. The rating applicable to a delivered configuration is confirmed in the order's technical agreement. Component sourcing for the generator set, battery, printer and air conditioner is also confirmed against the order rather than treated as a performance claim.

This is not a shelf item with one fixed build. The rail sections and grades to be welded determine the electrode set, burr-pushing cutter and normalising coil; one set is supplied as standard and further sets are configured to the project. The generator set, cooling package, tooling and the process parameters stored in the welding management system are all confirmed before manufacture against the rail profile, the approved welding procedure, the site conditions in Section 8 and the standards named in the enquiry.
Tell us in the first message: the rail sections and steel grades, the standards and acceptance tests the joints will be judged against, the maximum joint cross-section, the working altitude and temperature range, whether normalising is required after welding, the data and reporting format the infrastructure owner expects, and the power and handling arrangements at the site. A layout drawing or a description of the possession window helps more than a long specification narrative, particularly where the plant has to be recovered to travelling state within a fixed hand-back time.
We develop and configure the machine to the ordered rail and project requirements, and confirm feasibility before quoting. Inspection records, non-destructive testing, third-party witness testing and spare tooling sets are optional items agreed with the order; no certificate or test report is held in advance of a specific order.

Rails from 50 kg/m to 75 kg/m, up to 12000 mm2 cross-section, across Chinese, European, Russian and American standard profiles, including pearlitic and bainitic high-strength grades. Different sections need matched electrodes, a burr-pushing cutter and a normalising coil; one set is standard at delivery.
Both are flash butt processes and both are supported by the head. Continuous flashing maintains a sustained arc during heating, while pulsating flashing alternates contact and separation. The approved welding procedure for the rail grade and section decides which is used; the machine stores the corresponding process parameters.
Yes. The YHR-120 normalising head with an open-close profile-following induction coil, a load-adaptive medium-frequency supply and air-blast cooling is integrated into the container, so normalising follows welding in the same supervised cycle.
The plant's rated welding and heat-treatment capacity is 13-14 joints per hour. Site output also depends on rail handling, alignment, inspection and the possession window, so that figure is plant capacity rather than a guaranteed production rate.
The stated envelope is -20 C to 50 C, up to 4000 m altitude and up to 90% relative humidity. Projects outside those limits need the generator and cooling configuration confirmed separately at enquiry stage.
An emergency system resets all working devices to the travelling state within 15 minutes, and a mechanical retraction function provides a further fallback. Four emergency stop buttons, generator alarms, a smoke alarm and fire extinguishers are fitted.
The welding management system stores at least 100000 joint records and at least 10 sets of process parameters, automatically judges each joint against preset criteria, plots welding and heat-treatment curves, and prevents generated data from being edited. Records can be dumped or printed via USB.
Yes, to the ordered configuration. State the rail section, steel grade, applicable standards and acceptance tests, site conditions and reporting requirements, and we will confirm the tooling, generator and process configuration before quoting.
State the rail sections and grades, joint standards and acceptance tests, site conditions, normalising requirement, reporting format and the possession constraints. ATK will confirm the configuration and feasibility before quoting a mobile rail flash butt welder for your project.