In a conventional track circuit, the running rails form part of the electrical detection circuit. When a wheelset enters the section, it provides a shunt between the rails and changes the state of the track-circuit equipment, indicating that the section is occupied. To distinguish one section from the next, the signalling system needs a defined electrical boundary. Where that boundary is made with a physical joint, an insulated rail joint (IRJ) provides the required separation. Its design therefore has to satisfy both the mechanical demands of the track and the electrical requirements of the signalling system
The location of an IRJ is consequently established by the signalling design, not selected from a product catalogue. In conventional track circuits, joints are commonly used at the limits of adjacent sections, but the number of joints and the rails in which they are installed depend on the circuit architecture. Some systems also require additional insulated joints for specific arrangements, such as polarity changes. An extra joint should not be introduced into an existing circuit without the signalling designer confirming the resulting electrical configuration, bonding and equipment interfaces.
In a conventional bolted design, electrical separation is maintained by the insulating end post between the rail ends and by insulating components around the bolts and fishplates, where these are part of the design. The fishplates or joint bars provide the mechanical connection across the rail gap. Other constructions may use different insulation arrangements. The rail profile, hole pattern, component set and installation procedure must therefore be treated as one approved assembly; a missing, damaged or incorrectly fitted insulating component can compromise the joint even when the defect is not obvious from track level
Location | Why the joint is there | Rail count |
Track-circuit limits shown in the signalling plan | Provide electrical separation where physical IRJs are used to define adjacent sections | One or both rails, according to the circuit and traction-return design |
Approach to a signal, where a circuit boundary is required | May define the approach-circuit limit so that train detection is available before the signal | As specified in the signalling plan |
Between signalled sections | Separates adjacent sections when the system uses physical insulated joints | As specified in the circuit architecture |
Feed / receiver interfaces, where specified | Any isolation, bond or equipment interface must follow the approved circuit diagram; this is not a universal IRJ location | As specified in the circuit diagram |
Plain-line approach to a turnout | May provide the boundary before the switch area when required by the signalling design | As specified in the signalling and traction-return design |
For a conventional double-rail track circuit that uses physical insulated joints at both ends, a pair of joints is normally installed at each boundary, giving four joints for one isolated section. That arrangement is not universal. A single-rail track circuit may insulate only the designated rail while the other rail participates in the traction-return arrangement; jointless track circuits may use tuned or electrical separation interfaces instead of conventional IRJs. The signalling and traction-return drawings must determine the actual count and configuration.
Plain-line placement also has to be coordinated with the track structure. EN 16843:2024 requires the technical documentation to show the joint axis and the support arrangement beneath the joint. In practice, the designer should review sleeper or bearer spacing, local track stiffness, rail-end alignment, drainage and nearby structures. A curve transition, a steep gradient, a bridge movement joint or another change in support conditions is not automatically prohibited, but it should not be selected without checking the resulting loads, movements and maintenance access.
An IRJ placed on the plain-line approach to a turnout may define the boundary between the approach track circuit and the circuit associated with the switch area, if that is what the signalling plan requires. The joint remains a plain-line joint only when it is located outside the special switch construction. Its exact position must be coordinated with the switch layout, track-circuit limits, traction-return bonds and the signalling designer’s requirements.

A turnout has several interacting mechanical and signalling interfaces. The switch blades move relative to the stock rails and are operated, locked and detected by the point machine. The closure rails connect the switch area to the crossing, where wheel-rail contact conditions change as the wheel passes through the crossing geometry. The forces and permissible speeds depend on the turnout design, crossing type, curvature, vehicle characteristics and project requirements. A turnout ratio alone is not enough to establish a universal diverging speed.

Slide baseplates support and guide the switch blades and form part of the turnout assembly. An integral cast slide baseplate for turnouts is therefore a separate turnout component, with its own drawing, sliding surface, fastening details and inspection requirements. It is not an insulated rail joint and does not provide track-circuit separation. At the interface between plain line and the switch area, the IRJ location remains a signalling-design decision.

EN 16843:2024 covers permanent mechanical rail joints for flat-bottom rails of 46 kg/m and above, including insulated and non-insulated joints for CWR and jointed track. Its scope excludes expansion devices, which are addressed by EN 13232-8, and special joints in switch constructions. The EN 13232 series addresses switches and crossings; its different parts cover matters such as geometry, actuation, locking, detection and crossing arrangements. For an IRJ located within a switch construction, the applicable design and acceptance requirements must be agreed with the systems contractor and the relevant signalling and turnout designers. The plain-line joint on the approach is assessed separately from a special joint within the switch panel.
Bolted, composite and glued constructions are common ways of providing an insulated rail joint, but they are not simply performance grades of one interchangeable product. Their suitability depends on the rail profile, mechanical duty, track form, electrical requirements, maintenance strategy and the project approval basis.

A bolted insulated joint is generally assembled from two fishplates or joint bars, an insulating end post and the specified bolts, bushes and washers. Four-hole and six-hole arrangements are common, but the drilling pattern and dimensions must match the rail profile and the approved drawing. This construction may be considered for jointed track, sidings, yards and other applications where it meets the project’s load and maintenance requirements. Inspection should include bolt condition and specified torque, the insulating bushes and washers, rail-end alignment and signs of batter or hole elongation.

A composite insulated fishplate uses a non-metallic or reinforced composite bar to provide mechanical connection and electrical isolation. Some designs use glass-fibre reinforcement with a polymer resin system, but material composition, end-post arrangement and bolt insulation vary by product. It is therefore important to confirm the actual construction from the supplier’s drawing and test documentation rather than assume that every composite bar has the same material or water-resistance characteristics. Where access for maintenance is restricted, the inspection plan should pay particular attention to impact damage, cracking, contamination and insulation resistance.
A glued insulated rail joint bonds the fishplates to the rail web with an adhesive system and uses the specified bolting arrangement. The aim is to create a joint assembly with high bending stiffness and the longitudinal load capacity required by its application. Actual performance depends on the rail section, fishplate design, adhesive system, surface preparation, curing conditions and installation quality; it should not be assumed to equal the stiffness of an uninterrupted rail in every case. Factory-made and site-assembled units must both follow their approved manufacturing or installation procedures. For CWR or other demanding applications, the type approval and project acceptance requirements should be confirmed before a joint is proposed.

Construction | Where it is normally used | What the maintenance crew watches |
Bolted type, 4-hole / 6-hole patterns | Jointed track, sidings and yards where the design and project duty permit | Fastener condition and specified torque; bushes and washers; rail-end alignment and batter |
Composite bar, integral insulation | Applications specified for the particular composite design and approved for the site conditions | Impact damage, cracks, contamination, interface condition and insulation-resistance trend |
Bonded / glued type, factory-made or site-assembled | CWR or other demanding applications where the design, approval and project acceptance requirements support its use | Adhesive cracking or debonding, bar ends, fasteners, end-post condition and resistance trend |
A transition (or compromise) joint connects rails of different profiles or accommodates a difference in railhead wear; EN 16843:2024 defines a transition mechanical rail joint in these terms. A joggled joint is a particular mechanical arrangement and should be specified by drawing. Neither term, by itself, confirms electrical isolation. Where a track-circuit boundary is required, the enquiry must explicitly call for an insulated construction that has been designed and assessed for that duty.
EN 16843:2024 applies to permanent mechanical joints for flat-bottom rails of 46 kg/m and above. It covers insulated and non-insulated joints for stressed rail (CWR) and unstressed rail (jointed track), and addresses factory-made (prefabricated) as well as site-assembled constructions. The standard sets out design, mechanical, electrical, type-approval, acceptance and documentation requirements. Type approval is structured in two stages: the first addresses the applicable design and performance requirements, and the second addresses field testing. The applicable route differs between CWR and jointed-track joints. Acceptance testing is also treated separately for factory-made and site-assembled joints; the relevant clauses should be followed for the construction being supplied.
The longitudinal tensile requirement for an insulated joint used in CWR is calculated from the rail cross-sectional area, the temperature difference and the safety factor. EN 16843:2024 specifies E = 210 GPa and a thermal expansion coefficient of 1.2 × 10⁻⁵ K⁻¹; the temperature difference is defined by the customer, and the safety factor is also customer-defined, with 1.5 recommended by the standard. The vertical repeated-bending test uses a four-point arrangement and runs for three million cycles at 3–10 Hz. Test apparatus and specimens are conditioned at 23 ± 5 °C; the test arrangement and load are determined from the required bending moment and the relevant joint geometry. A tensile-test machine capacity of about 2,500 kN is cited as typically sufficient, not as a mandatory capacity for every joint or test.
Test condition | Example specified value | Reference / measurement path |
Dry, before mechanical testing | ≥ 10 MΩ | Bane NOR prefabricated glued-steel-bar IRJ specification (49E1 / 54E3 / 60E1); rail-to-rail and rail-to-fishplate |
Dry, after mechanical testing | ≥ 150 kΩ | Bane NOR prefabricated glued-steel-bar IRJ specification (49E1 / 54E3 / 60E1); rail-to-rail and rail-to-fishplate |
Wet, after at least 12 h immersion in 5% NaCl solution | ≥ 200 kΩ | Bane NOR prefabricated glued-steel-bar IRJ specification (49E1 / 54E3 / 60E1); rail-to-rail and rail-to-fishplate |
The electrical insulation values are not one set of universal pass/fail limits for every project. Clause 5.2.3 of EN 16843:2024 states that the values to be achieved are to be agreed between the customer and supplier; Annex H provides sample values. In the Bane NOR specification used for the table, resistance is specified for both rail-to-rail and rail-to-fishplate paths. The table above gives an example from Bane NOR’s published specification for prefabricated insulated rail joints with glued steel bars on its network, covering rail profiles 49E1, 54E3 and 60E1. The stated values apply within that specification’s scope; they are not blanket acceptance limits for all networks or for every bolted, composite or glued IRJ construction.
TB/T 2975-2018 is titled “Glued Insulated Rail Joints” and should not be treated as a universal standard for every bolted or composite IRJ. Chinese projects may specify it for the glued-joint products within its scope, alongside project-specific drawings and acceptance requirements. Supplier catalogues may publish other resistance figures, but those values cannot be compared unless the test condition, measurement path, test stage and method are the same. The contract specification and the applicable controlled standard should govern.
In continuously welded rail, temperature changes produce longitudinal forces: falling rail temperature can create tensile force, while rising temperature can increase compressive force and contribute to track-stability concerns. An IRJ intended for CWR must be designed for the applicable rail section, neutral-temperature assumptions, temperature range and track restraint conditions. EN 16843:2024 makes the customer-defined temperature difference an input to the minimum tensile-strength calculation. The joint location and surrounding rail restraint must therefore be checked as part of the track design, rather than selected simply because a particular length of rail is available.
Drainage and track condition influence the service environment of the joint. Water and conductive contamination can reduce measured insulation resistance, while poor rail-end alignment or inadequate support can increase impact loading and accelerate mechanical wear. Rail profiles such as 60 kg/m sections to EN 13674-1, UIC 60 and 115RE are not interchangeable: each has its own geometry, drilling details and compatible fishplate design. The rail designation and governing standard should be stated in the enquiry, and the supplier’s drawing should confirm the hole pattern and component fit.
Insulation resistance should be checked using the instrument, test voltage, measurement period and connection arrangement required by the project maintenance procedure. Depending on the approved test method, the relevant paths may include rail-to-rail across the end post and rail-to-fishplate. Record each specified path separately, together with the joint identification, date, weather or surface condition, instrument and test settings. Comparing readings over time is useful only when the measurement method and conditions are sufficiently consistent.

The meaning of a reading depends on the acceptance and maintenance limits in the contract or the infrastructure manager’s rules. EN 16843:2024 addresses type approval and acceptance testing; it should not be read as establishing a single in-service alarm threshold for every operator. A maintenance programme may set its own limits and inspection intervals, including additional checks in wet seasons. Where a reading is abnormal, the signalling maintenance procedure should be followed and the joint assessed together with the associated bonds, wiring and track-circuit equipment.
Typical defects include a cracked or damaged end post, water ingress, contamination around insulating surfaces, damaged or displaced bushes and washers, corrosion of metallic components, loose or damaged fasteners, rail-end batter, elongated bolt holes and adhesive cracking or debonding in glued assemblies. The likely mechanism depends on the joint design and site conditions; a defect should be confirmed by inspection and the specified electrical and mechanical checks.
A false-occupancy indication is a symptom, not a diagnosis of an IRJ failure. Moisture or contamination at a joint may be one contributing factor, but the investigation should also follow the signalling maintenance procedure and consider bonding, cabling, track-circuit equipment and other site conditions. At overhaul, inspect the end post, insulating components, fishplate or bar ends, fasteners, rail-end alignment and support beneath the joint. Repeated failures at one location warrant a review of drainage, alignment, support and local operating conditions before the cause is attributed to a product batch.
A useful enquiry should identify the rail section and governing standard, the track-circuit boundary drawing, whether the circuit is single-rail or double-rail, the required joint type (bolted, composite or glued), and whether the unit is factory-made or site-assembled.The clip and baseplate arrangement around the joint is described on the crane rail clip fixing page. It should also state the applicable standard and project acceptance criteria, including the required insulation resistance, test condition and measurement paths. Add the bolt pattern, fastener grade and torque requirement, service temperature range, axle load, traffic duty, track form and any relevant traction-return or bonding requirements. Where steel rails and joint components are ordered together, state the drilling standard and drawing revision so that the rail and joint are supplied to a compatible configuration.
If the order also includes railway track bolts, specify the grade, neck profile, length, nut and washer requirements, and the applicable standard. Bolt dimensions and head or neck geometry must match the rail and fishplate arrangement. The inspection documents required for each lot should be agreed at the order stage.
No. IRJs are normally positioned where the signalling design requires electrical separation, usually at track-circuit limits when physical insulated joints form the boundary. Additional joints may be required for specific circuit arrangements, but they should only be introduced where the signalling designer has defined the associated electrical configuration and bonding.
There is no universal number. A conventional double-rail track circuit with insulated joints at both ends commonly uses four joints: one in each rail at each end. A single-rail arrangement may use a different configuration, and jointless track circuits may not use conventional IRJs at each boundary. The signalling and traction-return drawings determine the count.
EN 16843:2024 excludes special joints in switch constructions from its scope. The EN 13232 series addresses the design and interfaces of switches and crossings, including actuation, locking and detection. An IRJ on the plain-line approach can be specified as a plain-line joint, but a joint within the switch construction requires agreement with the systems contractor and the relevant signalling and turnout designers.
EN 16843:2024 requires the target insulation values to be agreed between the customer and supplier, and Annex H provides sample values. As one specific example, Bane NOR’s published specification for prefabricated insulated rail joints with glued steel bars covers rail profiles 49E1, 54E3 and 60E1 and sets dry, wet and post-mechanical-test values for rail-to-rail and rail-to-fishplate measurements. Those values apply to that specification’s scope; they are not universal limits for every joint construction. The contract and infrastructure manager’s specification determine the value that applies.
Use the test voltage, measurement period and connection method stated in the applicable test procedure and project specification. Do not transfer a voltage or reading time from another standard, a supplier catalogue or an unrelated maintenance practice. The instrument and settings should be recorded with each result.
A glued insulated joint is commonly considered for CWR applications because its bonded fishplate assembly is designed to provide the required longitudinal and bending performance. A bolted joint may be suitable for other track forms where its design and approval meet the project duty. The decision must be based on the rail profile, temperature range, track restraint, axle load, signalling requirements and the applicable type-approval and acceptance evidence.
Yes. A transition or compromise joint is designed to connect different rail profiles or accommodate a railhead-wear transition. However, the term does not itself mean that the joint is electrically insulated. Where the transition is also a track-circuit boundary, the enquiry must specify an insulated design and the required electrical performance.
Moisture and conductive contamination around an IRJ can contribute to low insulation resistance, but they are not the only possible causes of false occupancy. A damaged end post, compromised insulating components, corrosion, bonding or cabling defects and track-circuit equipment faults may also need to be considered. Follow the operator’s fault-finding procedure and assess the joint alongside the complete track-circuit installation.
Provide the rail profile and standard, track-circuit boundary drawing and circuit type, joint construction, factory or site assembly, project standard and resistance criteria, test conditions and measurement paths, bolt pattern and torque, temperature range, axle load and traffic duty. For replacement work, include clear photographs and the identification or drawing number of the existing assembly.
The signalling plan establishes where electrical separation is required; the joint design must then meet the mechanical and electrical duty at that location. The linked product pages provide construction details and dimensional information for the relevant product types. Before an order is placed, compare those details with the project drawing and approval requirements. For a technical review, contact us with the rail profile, track-circuit arrangement and relevant specification so the enquiry can be assessed against the correct configuration.